Deme Macarale - Installing Wind Power Turbines
Installing Wind Power Turbines


INSTALLATION & TRANSPORT OF WIND POWER TURBINES

      With an experience of more than 6 years and erection of more than 600 wind power turbines we pass several times difficult challenges with success for our main customers like: General Electric, Vestas, Gamesa, Fuhrlander, Nordex, Power Wind etc. From any kind of wind turbines we can provide road and water transport together with cranes services for all kind of work required for erection of wind turbines, installation of foundation rings, handle loads in storage places and harbors.


   Equipments
- Crawler cranes 300 to & 600 to
- Mobile cranes 500 to & 750 to
- Trailers for towers segments & nacelle
- Trailers for blade transport
- Several support cranes up to 250 to

Challenges
- Full day work in 2 shifts
- Difficult soil & landscape condition
- Movement inside the wind farm fasted possible
- Difficult weather condition

Solution approaches
- Several site survey reports before projects execution for transport route and installation sequence
- Detailed CAD-studies
- Lifting & transport plans
- Lining of bongosi mats
Main crane CC 2800-1
- Configuration SSL/LSL 108+12
- Support crane LTM 1160/1
- Project: 36 wind turbines VESTAS
- Location : near Galati-Romania
- High efficiency in erection rate
  
Main crane LG 1750
- Configuration
- Support crane LTM 1120/1
- Project: 80 wind turbines GE
- Location : near Tulcea-Romania
- Difficult landscape for movement of cranes inside the site
  
Main crane CC 1800-1
- Configuration: SSL/LSL 108+12
- Support crane LTM 1095
- Install rotor
- Project: 42 wind turbine GE
- Location: Around Tulcea Romania
  
Main crane LTM1500-8.1
- Configuration 42 m Telescope + 21 Luffing
- Support crane LTM 1095
- Preinstall tower sections
- Project: 42 wind turbine GE
- Location: Around Tulcea Romania
  